Haverford College
Quick Access
Going Green @ Haverford >

Going Green @ Haverford

  • Home
  • Gallery
  • Recycling
  • Committee on Environmental Responsibility
  • Initiatives
  • Resources
  • Environmental Questions?

    Ask the green squirrel.
  • Read more blogs>
  • Recent Posts

    • Earth Day!!
    • Bike Fixit Station at Haverford!
    • Founders gets sustainable makeover.
    • Why you don’t need a car at Haverford
    • “Let’s Eat!”- Food Day Celebration – A success!
  • Categories

    • Challenges
    • Composting
    • Conversation
    • Energy & Fuel
    • Events
    • General
    • Local Food
    • marquee
    • Recycling
  • Archives

    • April 2013
    • March 2013
    • February 2013
    • December 2012
    • October 2012
    • September 2012
    • August 2012
    • June 2012
    • May 2012
    • April 2012
    • March 2012
    • February 2012
    • December 2011
    • November 2011
    • October 2011
    • September 2011
    • August 2011
    • July 2011
    • April 2011
    • March 2011
    • February 2011
    • January 2011
    • November 2010
    • August 2010
    • April 2010
    • March 2010
    • January 2010
    • October 2009
    • August 2009
    • July 2009
    • May 2009
    • April 2009
    • March 2009
    • February 2009
    • January 2009
    • December 2008
    • October 2008
    • September 2008
    • July 2008

Posts Tagged ‘triangular conduit’

Stokes Green Roof: Days 2, 3, 4 and 5

Tuesday, October 21st, 2008

The polyethylene root barrier comes in 18' wide rolls. It has to be cut and heat sealed together to provide a custom fit. This is the longest and most labor intensive step in the installation process.

Once the root barrier is installed the next step is to lay the protection fabric. This gives an extra level of protection to the underlying roof membrane.

Once the protection fabric goes down triangular conduit is placed on top. The conduit contains narrow slits which funnels excess water to the drains.

Once the conduit is installed the drainage mat is placed face down. The mat picks up excess water and moves it towards the conduit.

Stone edging is installed to prevent wind lift.

Tags: drainage, roof membrane, root barrier, stone edging, triangular conduit
Posted in General, marquee | Comments Off

Haverford College • 370 Lancaster Avenue • Haverford, PA 19041
Going Green @ Haverford is proudly powered by WordPress